New Crane and Hoist System Delivers the Goods
The Work-Rated hoist includes a mechanical load brake as well as a motor brake for more operator confidence. The VAC-U-LIFT vacuum handling device is equipped with saf-lift lights as well. This system allows one person to quickly and efficiently load a metal press. The VAC-U-LIFT 6 pad lifting device is supported by a WRIGHT Work-Rated 5 ton hoist. This system is used to move single sheets of plate into a press.
|
|
Ingersoll Rand Hoists for Nuclear Weapons
When your job is to assemble, evaluate, and maintain nuclear weapons for the United States Government, it goes without saying that only equipment that meets exacting standards for design, manufacturing, and assembly is allowed in such a critical application environment. The customer required hoists built to ASME NUM-1-2004, Rules for Construction of Cranes, Monorails, and Hoists, a design standard for hoists and cranes used in nuclear facilities. The hoists are to be used for the assembly and testing of nuclear weapons.
|
|
Demag DC-Com Chain Hoists on High Speed Rail Project
Industry: High Speed Rail Line Application: The development of a new high speed rail line required precise lifting and positioning of sections during the laying of the track bed for the high speed train. Due to the exposure to the potential wide temperature ranges, humidity levels, and precipitation amounts, the units selected must be reliable in these environmental conditions. Solution: Demag supplied simultaneously controlled (4) DC-Com chain hoists for the precise lifting and positioning of the sections of the train track bed.
|
|
Demag Electric Rope Hoist 24-Hour Operation
Industry: Steel Industry Application: Blume Steel Service Ltd. is using wire rope hoists on a Demag Crane to transport and handle steel sheets and plates. The Demag double girder overhead traveling crane is “gently” handling heavy steel sheets and plates when needed, but also travels fast when required. The customer also depends on a high level of reliability for the crane, which is in continuous operation 24 hours, every day. Solution: Demag 20 Ton DRPRO hoists on a Demag crane. The two hoists are equipped with 2-speed lift, and mounted on a double girder top running trolley. The crane is a top running double girder configuration utilizing a box girder. The application also required
|
|
Demag Electric Rope Hoist Snowmaking Operation
Application: Demag 10 Ton DRPRO hoist on a Demag Crane for one of the highest crane application in the world. The equipment is used for preventive maintenance on an innovative snowmaking installation. The “Snowmaker”, supplied by the company IDE Technologies Ltd., produces 3300 cubic feet of artificial snow every day, in high quality and without any chemical additives. Solution: The hoist is equipped with 2 speed lift, low headroom under running style trolley with a top running single girder beam crane configuration. The hoist requirement was 2 speed lift, but the other travel motions are quipped with variable speed for ease when transporting materials.
|
|
Demag Electric Rope Hoist In The Galvanizing Industry
A metal galvanizing plant with a harsh environment facility needed a system to handle long loads with versatility. The units need to be able to run as a single unit or as two individual hoists, allowing dipping of metal tubes. Demag provided a 10 Ton DRPRO Hoists on a Demag Crane. Features and benefits provided: Safe Handling, Variable speed travel as required by the application, Simultaneous and independent control as needed when lifting and Radio remote control allows the operator to always remain at a safe distance.
|
|
Demag Electric Rope Hoist Metal Flooring Plant
Demag provided a 10 Ton DRPRO Hoist on A Demag Crane for a metal flooring company manufactures metal floor decking products and associated metal flashings for use in the fast track construction. With a projected output of over 2,500,000 sq feet of metal decking per year, performance and reliability were deciding factors. Features and benefits provided: Safe Handling, Slow speed travel for positioning, High speed with positioning not required and Radio remote control allows the operator to always remain at a safe distance.
|
|
Electrolift Rail Car A/C Maintenance Hoist
The customer required a hoist that can remove and replace the air conditioner unite from the top of the railcar. The unit must be removed at an angle, requiring independent hoist movement. One end of the unit is raised, moved forward slightly, then leveled and completely removed from the car. This was accomplished by providing two independently controlled hoists in a common frame. One radio control unit controls two hoists with selector switch for either hoist, or combined hoist operation.
|
|
R&M’s Spacemaster® SX Electric Wire Rope Hoists and Components in a Magnet Crane Application
The project required a 40 ton capacity double girder top running crane with two (2) 20 ton capacity hoists equipped with magnets for use in a CMAA Class D Service steel plate handling application. This heavy-duty application also called for a high hoisting speed, high trolley travel sped and a high bridge travel speed. The location for this application was under a roof with the sides of the building open exposing the equipment to the elements.
|
|
Well Planned Hoist Maintenance Program Reduces Downtime Significantly
“At the heart of the success of the plant is the organized maintenance program”. Very often, usual hoist wear and tear produces ordinary breakdowns that derail a process or plant for more time than is actually necessary. Regular inspection and maintenance can have a dramatic effect on the efficiency of production, safety awareness and overall profitability. Much of the downtime produced by breakdowns and maintenance has been reduced or eliminated by the implementation of a well thought out and organized maintenance program.
|
|
R&M’s LoadMate® Electric Chain Hoist in a Special Low Headroom Application
A global petrochemical manufacturer was looking at expanding production by adding additional Super Sack machines with 1 & 2 ton capacity motorized trolley electric chain hoists. The hoists required a special headroom dimension of 14.25” or less.
|
|
R&M’s Stagemaker® Concert Hoist with Raynok Motion Control System
The project required eight (8) electric chain hoists to move video projectors to various preset levels during worship services in a Houston, Texas church. The key requirements for the equipment were – the ability to have pre-programmed cues, the repeat accuracy of the hoist hook positions, the ability to adjust the hook positions if needed during and between cues of the service, and to not hear the hoists while in operation.
|
|
R&M’s QX Modular Crane Package in a Special “Iron & Metal Works” Application
The project required a crane equipped for outdoor use that featured a “Restricted Area Protection” option to prevent the trolley from traveling into the area over the crane operator’s pulpit located on the crane bay floor. The Features/Benefits Provided: Restricted Area Protection • Location under the crane that cannot be accessed by the hoist, Outdoor Service Protection • Protection against moisture in cold or very humid conditions.
|
|
Unique Rail System “Off/On Ramp” Allows Quick Hoist Exchange on Production Line
A computer controlled renovation and refurbishing line with specific time and efficiency goals relies heavily on the proper continuous function of all of its components. To minimize the line’s downtime, engineers developed a unique “off-ramp/on ramp” set up. Features and benefits: Minimal line downtime due to the rapid exchange of hoists. Computer controls and monitors ensuring peak efficiency and same model of hoists allows for an ample in-0hous inventory.
|
|
University-Industry Partnership Studies Auto Workers Ergonomic Situation
In the automotive industry, a single back injury can add as much as $2,000 to the cost of production of a single vehicle. But until recently, there hasn’t been very much research into the ways that U.S. automakers could reduce stress, fatigue and injury to U.S. auto workers. A university and industry collaboration has developed a think-tank that has begun to research ways to use material handling equipment to reduce these stresses on workers.
|
|
The New Demag DR Pro Hoist Provides Efficient Handling of 25 ton Steel Coils
The Demag DR Pro Hoist provides the needed ruggedness and sensitive speed control from a standardized hoist to meet the duty requirements of steel coil handling and processing.
|
|
Demag’s Electric Chain Hoist For Wind Power Generation Station Maintenance
A company, well known to the wind power industry, who installed over 300 units in Grover, Texas needed a method of lifting heavy tools and spare parts to the nacelle for maintenance and repair of their Wind Generating Turbines. The problem was, they need to lift up to 425 feet. Demag met the challenge and developed a hoist specifically for maintenance of wind power generators.
|
|
Coffing Hoists offers Electric Chain Hoists for Special Application
The Coffing EC (Electric Chain Hoist) Turnover Model was specifically engineered to meet the needs of machining operations, fabricators, manufactured housing and any other application that requires complete rotation of large and heavy items.
|
|
Heavy Duty Electric Chain Hoist Operates Over Hot Sulfuric Acid
A Pennsylvania metal castings foundry was using an electric hoist over a hot sulfuric acid tank. The harsh environment was too much for the hoist in this application. Daily maintenance and repairs were needed just to keep the hoist operational. A heavy duty electric chain hoist was installed which comes standard with a fan cooled 60 minute duty rated motor and a completely sealed body, and it held up to the rigors of this tough environment.
|
|
Demag DR Pro Hoists with Simultaneous and Independent Hoists are the Ideal Solution for Handling Long Materials
Handling of long bulky materials has often been a challenge when the hoists and trolleys do not run at the exact same speeds. Typically when two independent hoists are operated in parallel, the differences in starting and stopping times of the hoists causes the hoist lift or trolley travel to not be synchronized.
|